Signed in as:
filler@godaddy.com
Signed in as:
filler@godaddy.com
SNOM Quick Sheet
Field Tech will run the cable from MDF Switch to the ethernet port of the SNOM Paging box.
Then Tech will need to run a cable from the Output,on the SNOM, to the input of the Amplifier for the site's Paging system.
A Cat5/6 patch Cable will need to be ran from MDF/IDF to the Network Port on the SNOM unit, to connect with the
A cable will need to be ran from the SNOM Paging unit to the input of the in-house amplifier
From the in-house amplifier, there should already be cables running to the horns, or speakers.
Might need to adjust Volume and Gain.
Dial the correct extension on the phone and running test through the speakers.
Copyright © 2024 System Support Technology - All Rights Reserved.
Powered by SST